
Hayden Bridge celebrates 75 years of service as EWEB looks forward to a new era of water resiliency
A lot has changed in the water treatment industry since Hayden Bridge was built in 1950. For its 75th anniversary, EWEB Water Treatment Supervisor, Toby Dixon, looks back at how the plant has adapted and outlines what EWEB is doing to secure a more resilient water future.

Walterville Hydroelectric Project to remain offline through 2025
EWEB continues to pursue repair plans but must fulfill additional investigation requirements before resuming operation.

EWEB reaffirms commitment to resilience with Wildfire Mitigation Plan approval
The utility is testing new equipment, leveraging technology, and incorporating third-party expertise to bolster electric system resiliency to a range of threats, including wildfire.

Energy conservation could offset large portion of growth in power demand
Preliminary results of an EWEB study indicate that cutting back demand can contribute to maintaining a reliable, affordable energy supply.