BUSINESS SERVICES AGREEMENTS

Staff did not include costs for evaluating changes to the Leaburg fish screen in the original agreement since the Federal Energy Regulatory Commission did not require these changes under the original license in 1997. Since the legal challenge to the 1997 license, we must now address these "prescriptions." Although staff is working with the fisheries agencies to identify as effective, but less costly, ways to protect the fishery resources, we must complete preliminary studies and designs to determine how much facility change is necessary to comply with the prescriptions as presented. The preliminary study and designs will cost $10,324. For background purposes, the Board should know that the prescriptions presented by the agencies could cost millions of dollars to construct.

The increased cost of power has prompted some changes in the way we view the work ahead of us at Leaburg-Walterville. One change is to replace selected auxiliary equipment in the powerhouses. Because the cost of power was relatively low, we were more willing to take some risk in experiencing a forced outage, due to not replacing auxiliary systems during other work in the powerhouses. Since power costs have escalated, we believe that re-evaluating replacement of auxiliary equipment is prudent. This amendment provides $7,534 for these studies.

Due to the increased cost of power, we are also rethinking the replacement of the two Francis turbine units at the Leaburg facility. To retrofit the power house to accommodate a larger Kaplan turbine was not cost effective earlier, since the additional physical work cost more than the additional generation benefits gained from a Kaplan turbine over the life of the unit. The higher power costs may make this approach more viable. This amendment provides $9,719 for a preliminary evaluation of a Kaplan turbine at Leaburg. If the analysis shows that the concept has merit, a future amendment will be considered for detailed analysis and design for installing a Kaplan unit to replace one Francis turbine, and replacement of the other Francis turbine in kind.

As I have stated before, as we continue to develop the details relating to the Leaburg-Walterville project, we will make appropriate changes to the scope of work for Montgomery Watson. Contact person is Gale Banry, 484-2411, ext. 3413.

Pioneer - Electric Division. This is for the purchase of five network transformers for installation in 2001 to serve the new public library building and TelecommLocate facility in downtwon Eugene. The anticipated delivery date is July, 2001. Of the total purchase price of $116,230, $96,365 will be reimbursed by the TelecommLocate developer and the City of Eugene. Contact person is Dean Ahlsten, 484-2411, 3210.